Stuart, really looking forward to installing this. Will give it a go in the next day or soā¦ So glad this plugin is in itās own forum (just noticed that)ā¦
Just posted the release files above. Hope the install is smooth ā¦
Thumbs up Stuart!!!
Followed all the steps, but:
50 08/25/14 11:24:40.417 luup_log:75: GCal3 gc_V 0.6:Getting new token __LEAK__ this:40960 start:3620864 to 0x12e1000 <0x8c24>
50 08/25/14 11:24:40.420 luup_log:75: GCal3 gc_V 0.6:Client email is: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com __LEAK__ this:4096 start:3624960 to 0x12e2000 <0x8c24>
50 08/25/14 11:24:40.792 luup_log:75: GCal3 gc_V 0.6:Command rm /etc/cmh-ludl/GCal3/GCal3.token returned 256 <0x8c24>
50 08/25/14 11:24:41.027 luup_log:75: GCal3 gc_V 0.6:Command /usr/lib/lua/googlejwt.sh xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com https://www.googleapis.com/auth/calendar /etc/cmh-ludl/GCal3/GCal3.pem /etc/cmh-ludl/GCal3/GCal3.token returned 32512 <0x8c24>
50 08/25/14 11:24:41.028 luup_log:75: GCal3 gc_V 0.6:Could not execute the googlejwt.sh script <0x8c24>
50 08/25/14 11:24:41.029 luup_log:75: GCal3 gc_V 0.6:Fatal error trying to get access token <0x8c24>
06 08/25/14 11:24:41.032 Device_Variable::m_szValue_set device: 75 service: urn:srs-com:serviceId:GCalIII variable: gc_nextCheck was: 2014-08-25T14:13:52 now: 2014-08-25T14:24:32 #hooks: 0 upnp: 0 v:(nil)/NONE duplicate:0 <0x8c24>
50 08/25/14 11:24:41.033 luup_log:75: GCal3 gc_V 0.6:Next check will be in 10800 sec at 2014-08-25T14:24:32 <0x8c24>
The calendar shows up fine though after opening the calendar-tab, the device hangs on āCheckingā¦ā.
Any idea?
Stuart,
Will GCal3 install over GCal_II or would it be appear as another device?
Thank you!
JR
[quote=āduiffie, post:5, topic:182612ā]Followed all the steps, but:
50 08/25/14 11:24:40.417 luup_log:75: GCal3 gc_V 0.6:Getting new token __LEAK__ this:40960 start:3620864 to 0x12e1000 <0x8c24>
50 08/25/14 11:24:40.420 luup_log:75: GCal3 gc_V 0.6:Client email is: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com __LEAK__ this:4096 start:3624960 to 0x12e2000 <0x8c24>
50 08/25/14 11:24:40.792 luup_log:75: GCal3 gc_V 0.6:Command rm /etc/cmh-ludl/GCal3/GCal3.token returned 256 <0x8c24>
50 08/25/14 11:24:41.027 luup_log:75: GCal3 gc_V 0.6:Command /usr/lib/lua/googlejwt.sh xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com https://www.googleapis.com/auth/calendar /etc/cmh-ludl/GCal3/GCal3.pem /etc/cmh-ludl/GCal3/GCal3.token returned 32512 <0x8c24>
50 08/25/14 11:24:41.028 luup_log:75: GCal3 gc_V 0.6:Could not execute the googlejwt.sh script <0x8c24>
50 08/25/14 11:24:41.029 luup_log:75: GCal3 gc_V 0.6:Fatal error trying to get access token <0x8c24>
06 08/25/14 11:24:41.032 Device_Variable::m_szValue_set device: 75 service: urn:srs-com:serviceId:GCalIII variable: gc_nextCheck was: 2014-08-25T14:13:52 now: 2014-08-25T14:24:32 #hooks: 0 upnp: 0 v:(nil)/NONE duplicate:0 <0x8c24>
50 08/25/14 11:24:41.033 luup_log:75: GCal3 gc_V 0.6:Next check will be in 10800 sec at 2014-08-25T14:24:32 <0x8c24>
The calendar shows up fine though after opening the calendar-tab, the device hangs on āCheckingā¦ā.
Any idea? :-)[/quote]
@duiffie
This log tells me there was a error trying to execute the command /ur/lib/lua/googlejwt.sh ā possibly that it could not be found ā¦
The number and type of arguments looks correct
What does the log file indicate at the very start ? Itās possible there was a failure in downloading googlejwt.sh or setting itās permissions.
Unfortunately googlejwt.sh is currently a āblack boxā there is no debugging. Thatās the next thing Iām working on, although - given a correctly formed GCal3.json file - Iāve not seen it fail.
Lets see if googlejwt.json exists first - can you telnet in ? do an āls -lā ?
[quote=āroquej, post:6, topic:182612ā]Stuart,
Will GCal3 install over GCal_II or would it be appear as another device?
Thank you!
JR[/quote]
You āshouldā be fine - I think (Iām on the road for a couple of days) there may be one global variable that I have not tidied up that is common with GCal_II but itās only used briefly when decoding calendar results - so it would be bad luck if there was a ācollisionā. Even then - Iām not certain how Lua / mios seprates the execution space ā¦ so it might be perfectly fine even as is.
[quote=āStuart, post:7, topic:182612ā][quote=āduiffie, post:5, topic:182612ā]Followed all the steps, but:
50 08/25/14 11:24:40.417 luup_log:75: GCal3 gc_V 0.6:Getting new token __LEAK__ this:40960 start:3620864 to 0x12e1000 <0x8c24>
50 08/25/14 11:24:40.420 luup_log:75: GCal3 gc_V 0.6:Client email is: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com __LEAK__ this:4096 start:3624960 to 0x12e2000 <0x8c24>
50 08/25/14 11:24:40.792 luup_log:75: GCal3 gc_V 0.6:Command rm /etc/cmh-ludl/GCal3/GCal3.token returned 256 <0x8c24>
50 08/25/14 11:24:41.027 luup_log:75: GCal3 gc_V 0.6:Command /usr/lib/lua/googlejwt.sh xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx@developer.gserviceaccount.com https://www.googleapis.com/auth/calendar /etc/cmh-ludl/GCal3/GCal3.pem /etc/cmh-ludl/GCal3/GCal3.token returned 32512 <0x8c24>
50 08/25/14 11:24:41.028 luup_log:75: GCal3 gc_V 0.6:Could not execute the googlejwt.sh script <0x8c24>
50 08/25/14 11:24:41.029 luup_log:75: GCal3 gc_V 0.6:Fatal error trying to get access token <0x8c24>
06 08/25/14 11:24:41.032 Device_Variable::m_szValue_set device: 75 service: urn:srs-com:serviceId:GCalIII variable: gc_nextCheck was: 2014-08-25T14:13:52 now: 2014-08-25T14:24:32 #hooks: 0 upnp: 0 v:(nil)/NONE duplicate:0 <0x8c24>
50 08/25/14 11:24:41.033 luup_log:75: GCal3 gc_V 0.6:Next check will be in 10800 sec at 2014-08-25T14:24:32 <0x8c24>
The calendar shows up fine though after opening the calendar-tab, the device hangs on āCheckingā¦ā.
Any idea? :-)[/quote]
@duiffie
This log tells me there was a error trying to execute the command /ur/lib/lua/googlejwt.sh ā possibly that it could not be found ā¦
The number and type of arguments looks correct
What does the log file indicate at the very start ? Itās possible there was a failure in downloading googlejwt.sh or setting itās permissions.
Unfortunately googlejwt.sh is currently a āblack boxā there is no debugging. Thatās the next thing Iām working on, although - given a correctly formed GCal3.json file - Iāve not seen it fail.
Lets see if googlejwt.json exists first - can you telnet in ? do an āls -lā ?[/quote]
it does exist and it is executable:
ls -ltr /usr/lib/lua/googlejwt.sh
-rwxr-xr-x 1 root root 1240 Aug 25 18:04 /usr/lib/lua/googlejwt.sh
i see that the openssl command is used within this shell script. My box (vera 2) doesnāt seem to have openssl installed, can that be a reason?
@ Duiffie
Wow! I have a vera light and do not know if there is supposed to be a difference.
The reason I went that route is because vera does not have a lua module that would otherwise be used. So I assumed that the *nix libraries would be the safest approachā¦
Iāll send an email to vera support and ask. It may be a simple opt install - if so we can do that manually and later I can pout a check in the plugin.
[quote=āStuart, post:10, topic:182612ā]@ Duiffie
Wow! I have a vera light and do not know if there is supposed to be a difference.
The reason I went that route is because vera does not have a lua module that would otherwise be used. So I assumed that the *nix libraries would be the safest approachā¦
Iāll send an email to vera support and ask. It may be a simple opt install - if so we can do that manually and later I can pout a check in the plugin.[/quote]
I did 2 things and then things started to work:
- installed openssl: opkg install openssl-util
- changed the first line of the googlejwt.sh script (#!/bin/bash to #!/bin/ash) because bash seems not present on vera 2 as well
Great! And Thanks! !!!
I suspect that ash vs bash is just a symlink to busybox- strange that MCV would do that. ā¦ might be an openwrt thing. ā¦
Might be that the script can be made generic by invoking busybox direct.
Iām traveling this week but will look at some options when I return including auto installing opened out itās not there. ā¦
Iāve upgraded from GCal II to GCal 3.
Now, whenever Vera needs to make a reload it will take like ages. I have 4 defined calendar devices. The reload happens an arbitrary number of times, typically 4 times in a row. It says āUnit Busyā, then it says āRunning LUA Startupā or āStarting LUA Engineā. Then it starts with āUnit Busyā and so onā¦ Before it was only a single cycle.
[quote=āfarang, post:13, topic:182612ā]Iāve upgraded from GCal II to GCal 3.
Now, whenever Vera needs to make a reload it will take like ages. I have 4 defined calendar devices. The reload happens an arbitrary number of times, typically 4 times in a row. It says āUnit Busyā, then it says āRunning LUA Startupā or āStarting LUA Engineā. Then it starts with āUnit Busyā and so onā¦ Before it was only a single cycle.[/quote]
Once itās done does it work correctly?
Can you capture a log file?
I did not test with multiple plugins since hopefully the ability to define multiple keywords makes that unnecessary. I will try to test but may not get to it until next week.
[quote=āStuart, post:14, topic:182612ā][quote=āfarang, post:13, topic:182612ā]Iāve upgraded from GCal II to GCal 3.
Now, whenever Vera needs to make a reload it will take like ages. I have 4 defined calendar devices. The reload happens an arbitrary number of times, typically 4 times in a row. It says āUnit Busyā, then it says āRunning LUA Startupā or āStarting LUA Engineā. Then it starts with āUnit Busyā and so onā¦ Before it was only a single cycle.[/quote]
Once itās done does it work correctly?
Can you capture a log file?
I did not test with multiple plugins since hopefully the ability to define multiple keywords makes that unnecessary. I will try to test but may not get to it until next week.[/quote]
First I want to say Thank You for your great work. ;D
Yes, everything seems to work after itās done reloading etc , so itās not that urgent. It can wait until you have time to look into it. I use multiple GCal 3 devices since I have several calendars to watch
If You canāt reproduce the behaviour I will learn how to produce a log file. Thanks! ;D ;D ;D
New status update:
This morning one of my main PLEG wouldnāt load due to āError loading Startup Luaā (or something like that). I canāt say why. I had to resolve it by uninstalling GCal 3 and replace it by the old GCal II. Everything works smoothly with the old plugin.
I tried first to just unset the calendar URLs but it didnāt help. I wish I could provide some info that is more helpful but I really had to get my Vera system back in a working state.
New status update:
This morning one of my main PLEG wouldnāt load due to āError loading Startup Luaā (or something like that). I canāt say why. I had to resolve it by uninstalling GCal 3 and replace it by the old GCal II. Everything works smoothly with the old plugin.
I tried first to just unset the calendar URLs but it didnāt help. I wish I could provide some info that is more helpful but I really had to get my Vera system back in a working state.[/quote]
PLEG gets a little agitated when devices it knew about are changed. I have found that I need to remove all references to old devices and replace them whenever I either change the name of a plugin or itās device number changes.
With 4 instances of the plugin. ā¦ it would be easy get out pic sync
New status update:
This morning one of my main PLEG wouldnāt load due to āError loading Startup Luaā (or something like that). I canāt say why. I had to resolve it by uninstalling GCal 3 and replace it by the old GCal II. Everything works smoothly with the old plugin.
I tried first to just unset the calendar URLs but it didnāt help. I wish I could provide some info that is more helpful but I really had to get my Vera system back in a working state.[/quote]
PLEG gets a little agitated when devices it knew about are changed. I have found that I need to remove all references to old devices and replace them whenever I either change the name of a plugin or itās device number changes.
With 4 instances of the plugin. ā¦ it would be easy get out pic sync[/quote]
I had 3 trigger references in PLEG to the GCal devices. When Upgrading I created new GCAL 3 instances first and just changed the trigger references from the old to the new devices. (Btw, PLEG wonāt recognize any changes made unless I also alter the trigger name). After that I deleted the old GCal II devices and the Plugin itself. I did it this way because I donāt want to reimplement my PLEG logic.
This morning when I had problems with my main PLEG starting, I did the same procedure as described above except from that I downgraded. That is, I actually created 4 new GCal II devices. It works fine after changing the references in PLEG to the new GCal II devices, no issues at all and fast reloading.
I donāt know if this information helpsā¦ I wish I had a spare Vera for testing purposes
@farang
This is good feedback. I suspect that itās related to the multiple plugin reload issue - which I have reproduced.
The problem occurs when the plugins are trying to access google at the same time. Itās a little different method between GCal_II and GCal3. I suspect the problem would occurs after startup during later checks but itās definitely a timing thing and sometimes happens and sometimes not - so maybe thatās what happened.
Iām going to implement a semaphore asap and see if that solves it. ā¦
A spare vera would be niceā:no_mouth:
[quote=āfarang, post:13, topic:182612ā]Iāve upgraded from GCal II to GCal 3.
Now, whenever Vera needs to make a reload it will take like ages. I have 4 defined calendar devices. The reload happens an arbitrary number of times, typically 4 times in a row. It says āUnit Busyā, then it says āRunning LUA Startupā or āStarting LUA Engineā. Then it starts with āUnit Busyā and so onā¦ Before it was only a single cycle.[/quote]
I had a long flight delay and was able to put in and test some semaphore code that should prevent this from happening. It forces a staggered calendar refresh between instances of the plugin.
The problem looked to be due to simultaneous https requests - but thatās a bit speculative. Can you try this version and let me know? I could not get it to ābreakā running two plugins at the same time trying for the same calendar ā¦
Attachment removed ā¦ had a bug