I recently purchased a Levitan VRSC2 dual switch. I have had a hell of a time of getting it to work properly. I have read and re-read most of the posts concerning this unit, but it appears that they don’t fully explain how to get the device to pair properly or how to setup properly. Does anyone have the definitive answer: There appears to be plenty of people with similar problems.

I desire my unit to control one local load and one scene to operate a separate lighting fixture. I paired it by holding down both buttons, amber light and pair. Then I held each button to get an amber light. The first button does and the second button doesn’t. Also, if I get it to partially work with one button, the second button flashes green and does nothing else. Please, I need someone who has successfully installed on of these units.

Thanks

[quote=“e50golf, post:1, topic:187458”]I recently purchased a Levitan VRSC2 dual switch. I have had a hell of a time of getting it to work properly. I have read and re-read most of the posts concerning this unit, but it appears that they don’t fully explain how to get the device to pair properly or how to setup properly. Does anyone have the definitive answer: There appears to be plenty of people with similar problems.

I desire my unit to control one local load and one scene to operate a separate lighting fixture. I paired it by holding down both buttons, amber light and pair. Then I held each button to get an amber light. The first button does and the second button doesn’t. Also, if I get it to partially work with one button, the second button flashes green and does nothing else. Please, I need someone who has successfully installed on of these units.

Thanks[/quote]

Good luck, are you on ui7 or ui5? Which vera?

http://forum.micasaverde.com/index.php/topic,31507.msg227633.html#msg227633

U17 and using Vera lite.

As you can see with ui7 I’m in the same boat. I’m unable to get all 3 devices to add… How about you?

I get a different result each time. Once I got a scene controller and two appliance modules, once I got only two appliance modules, once I got three with no scene controller…

Well if you get 2 loads and 1 scene controller your good to go.